The works investor on the project for the construction of the 400kV transmission line Tirana-Podgorica is KESH-OST (operator of the carrier system) from Albania and Elektroprivreda Montenegro, with the contractor being Dalekovod d.d. The project is contracted as a turn key solution.
The technically demanding project consists of an aerial double OHL 400kV line with a length of 76.14km, and a single air section 400kV line with a length of 80.80km. Besides the transmission line, this project includes the construction of a 400kV conductor field in the existing transformer station 400/210kV Elbasan 2, and two 400kV conductor fields in the transformer station 400/220kV Podgorica 2.
The deadline for completion of works in 24 months starting from the date of the advance payment.
| Length of transmission line: | double OHL – 76.14km | |||
| Single line system – 80.80km | ||||
| Double line – twin system pylons | ||||
| Single line – standard pylons | ||||
| Voltage level: 400 kV | ||||
| Bundle conductor ACSR 3x2x490/65mm2 | ||||
| Insulation: glass capped insulators | ||||
| Two protective lines – OPGW | ||||
| Columns: steel-lattice | ||||
|
||||