Projects Currently Actual

Project in Norway

Project in NorwayConstruction of the 420kV transmission line Skareheia(Evje)-Holen.

Works on this project are divided into two parts. Expected start of works is September 2007, with completion planned by August 2009. The investor is a Norwegian state company Statnett.

Due to extremely difficult weather conditions and a poorly developed road infrastructure, works will be carried out with the assistance of helicopters. Works will be carried out at extremely low temperatures, in inaccessible locations, with up to three meters of snow. Meaning that the approach to this new organization of carrying out works will be performed by helicopters, which will be a real challenge. This will be the largest such structure built under such conditions by Dalekovod.

Project Technical Specifications:
Length of transmission line: 105km
Voltage level: 420 kV
Single-system line
Carriers: three bundled conductors
  Triple-bundle Feral 380 Grackle 606/77
  D = 34,04 mm
  Triple-bundle Feral 381 Lunde 703/89
  D = 36,6 mm
Insulation: glass capped insulators
2 protective lines: OPGW and classic
Columns: steel-lattice
Columns: supplied by the Client (bearing and tension)

--

Project in Albania

The works investor on the project for the construction of the 400kV transmission line Tirana-Podgorica is KESH-OST (operator of the carrier system) from Albania and Elektroprivreda Montenegro, with the contractor being Dalekovod d.d. The project is contracted as a turn key solution.

The technically demanding project consists of an aerial double OHL 400kV line with a length of 76.14km, and a single air section 400kV line with a length of 80.80km. Besides the transmission line, this project includes the construction of a 400kV conductor field in the existing transformer station 400/210kV Elbasan 2, and two 400kV conductor fields in the transformer station 400/220kV Podgorica 2.

The deadline for completion of works in 24 months starting from the date of the advance payment.

Project Technical Specifications:
Length of transmission line: double OHL – 76.14km
Single line system – 80.80km
Double line – twin system pylons
Single line – standard pylons
Voltage level: 400 kV
Bundle conductor ACSR 3x2x490/65mm2
Insulation: glass capped insulators
Two protective lines – OPGW
Columns: steel-lattice
Columns: self-supporting - twin system Barrel shaped on the Tirana Vaau Dejes section
- single system shape "Y" on the section Vau Dejes - Podgorica

--

Project in Kazakhistan

Dalekovod d.d.d Zagreb has signed a contract with the state company Kazakhstan Electricity Grid Operating Company (KEGOC) for the job of designing, construction and rolling out of the second transmission line Kazakhstan North – South.

The contractual deadline for completion of works is 760 days.

Project Technical Specifications
Length of transmission line: 390 km
Voltage level: 500 kV
Single conductor system
Conductors: ACSR 330/63, 3 bundled conductors
Insulation: polymer capped insulators
2 protective lines: OPGW + steel 75mm2
Columns: steel-lattice
Columns: carriers - with anchors,
- tensile - self-standing